Skip to content

Documentation Update Summary

Date: October 12, 2025
Updated Documents: 2
Status: Complete


Changes Made:

  • ✅ Updated Executive Summary with Tailwind v4 integration status
  • ✅ Added new “Tailwind v4 Integration” section under Recent Accomplishments
    • All 7 commits detailed with hash numbers
    • Tailwind ecosystem libraries listed
    • Component architecture explained
    • Working web apps documented
    • Technical achievements highlighted
  • ✅ Updated Technology Stack table with Tailwind entries
  • ✅ Replaced “Next Steps: Figma Tokens Studio” with “Next Steps: Storybook Integration”
    • Why Storybook is critical now
    • Current Storybook state
    • Phase 1-3 Storybook setup plan
    • Moved Figma to “Future” section
  • ✅ Updated Documentation Resources with new Tailwind guides
  • ✅ Updated Recommendations (immediate, short-term, medium-term, long-term)
  • ✅ Updated Success Metrics with Tailwind accomplishments
  • ✅ Updated Technical Debt section
  • ✅ Added Tailwind/Headless UI/Storybook to Support Resources
  • ✅ Updated final status line

Changes Made:

  • ✅ Expanded Chapter 2 (Storybook Integration Plan) with detailed step-by-step guide
    • 9 detailed steps with time estimates
    • Complete code examples for all configuration files
    • Full story code examples (Hero.stories.tsx, Button.stories.tsx)
    • Both generic (ui-web) and division-specific (ui-stay-match) stories
    • Troubleshooting section
  • ✅ Updated Pending Tasks to reference detailed Storybook guide
  • ✅ Added more Questions for Next Session (8 questions total)
  • ✅ Updated Useful Commands with Storybook commands

New Content Added (Chapter 2):

  1. Step-by-Step Integration (~2-3 hours total)

    • Step 1: Initialize package (~15 min)
    • Step 2: Configure Nx (~10 min)
    • Step 3: Tailwind v4 support (~15 min)
    • Step 4: main.ts configuration (~20 min)
    • Step 5: preview.ts configuration (~15 min)
    • Step 6: Introduction stories (~20 min)
    • Step 7: Component stories (~30 min)
    • Step 8: Test and verify (~15 min)
    • Step 9: Add to verification pipeline (~5 min)
  2. Complete Code Examples:

    • project.json with Nx targets
    • PostCSS + Tailwind configs
    • main.ts with Vite aliases and PostCSS
    • preview.ts with dark mode decorator
    • Introduction.mdx explaining architecture
    • Tailwind.mdx with ecosystem usage examples
    • Hero.stories.tsx (generic) - 5 variants
    • Button.stories.tsx (generic) - 9 variants + showcase
    • Hero.stories.tsx (Stay Match) - 3 variants
  3. Troubleshooting Guide for common issues


Terminal window
M docs/ANALYSIS_REPORT_2025-10-11.md
M docs/TAILWIND_INTEGRATION_HANDOFF.md
M packages/ui-stay-match/src/components/Hero/Hero.tsx # (Hero fix - not committed yet)

  1. Commit Hero Fix + both updated docs

    Terminal window
    git add packages/ui-stay-match/src/components/Hero/Hero.tsx
    git add docs/ANALYSIS_REPORT_2025-10-11.md
    git add docs/TAILWIND_INTEGRATION_HANDOFF.md
    git commit -m "fix(ui-stay-match): add default hero image fallback + update docs
    - Import hero-13-gay-couple-visiting-beach.jpeg as default
    - Use default image when backgroundImage prop not provided
    - Update ANALYSIS_REPORT with Tailwind integration status
    - Expand HANDOFF with detailed Storybook step-by-step guide"
  2. Production Build Verification

    Terminal window
    yarn nx build pinkguest-web
    yarn nx build bonjour_locker-web
  3. Push to Remote

    Terminal window
    git push origin feat/tailwind-integration

Follow Chapter 2 of TAILWIND_INTEGRATION_HANDOFF.md for complete Storybook setup.


DocumentStatusPurpose
TAILWIND_INTEGRATION_HANDOFF.md✅ COMPLETEMain handoff doc with 4 chapters
ANALYSIS_REPORT_2025-10-11.md✅ UPDATEDTechnical analysis + roadmap
tailwind-ecosystem-guide.md✅ EXISTINGLibrary usage guide
TAILWIND_ECOSYSTEM_SUMMARY.md✅ EXISTINGImplementation summary
tailwind-integration-guide.md✅ EXISTINGStep-by-step integration
design-token-system.md✅ EXISTINGDesign token architecture

Total Tailwind Documentation: ~10,000+ lines across all files


  1. Current Branch: feat/tailwind-integration
  2. Commits Ready: 7 committed + 1 pending (hero fix)
  3. Web Apps Running:
    • PinkGuest at localhost:4200
    • Bonjour Locker at localhost:4202 (may need restart)
  4. Next Milestone: Storybook integration (~2-3 hours)
  5. Complete Guide: See Chapter 2 in TAILWIND_INTEGRATION_HANDOFF.md

Summary: Both documents now fully reflect Tailwind v4 integration completion and contain comprehensive Storybook integration plans with step-by-step instructions ready for next session.